Corporate Office

Accenture

The Accenture expansion consisted of 65,000 SF at 75 5th St – as a current tenant on the 11th floor of an existing building, they expanded their space to include a portion of the 10th floor and all of the 9th floor. Construction included demolition of existing elements and a complete new build back including …

Accenture Read More »

Fisher Phillips

The Fisher Phillips project located at 1075 Peachtree ST consisted of a full floor renovation for the new regional headquarters covering 24,000 SF at a cost of $2.4M. The The buildout consisted of demountable partitions, operable partitions, video conferencing, video deposition rooms, and a large amenities area. The project was delivered with a fast-track schedule …

Fisher Phillips Read More »

UPS

This 35,034 total SF project included the renovation of a second generation office/warehouse space in Doraville, GA. The renovation included the demolition of an existing office space; existing entry doors werekept and new exterior windows and rooftop units were added as well as a separation wall between the office space and new warehouse addition. The …

UPS Read More »

Veritiv Corporation Atlanta Office

Project scope included a 2 ½ floor renovation for Veritiv corporate headquarters. Project scope included specialty glass fronts at all offices, re-working an existing connecting stair, marble and wood flooring throughout executive floor and a full service break area. LOCATION Atlanta, GA CLIENT Veritiv Corporation ARCHITECT Heery SIZE 56,660 SF Previous Next Jump to:

Russell Reynolds

Located in the 999 Peachtree building in Midtown, this project consisted of a half-floor renovation. Included in the scope of work was updated partition, millwork, ceiling tiles, light fixtures, appliances, and all finishes. LOCATION Atlanta, GA CLIENT Russell Reynolds ARCHITECT idea|span SIZE 11,232 SF Previous Next Jump to:

Ronald Blue

This project involved building out approximately 12,500 SF of tenant space. The space was previously vacant and totally demolished back to a “white box.” Therefore, to create an open and collaborative workspace designed by Rule Joy Trammell Rubio, new construction included all new drywall partitions, reworking of acoustical ceilings, new light fixture package, upgrading mechanical …

Ronald Blue Read More »

Popeyes Louisiana Kitchen Headquarters

This high-end, 2.5-floor project with a very short and demanding schedule required a perfectly orchestrated process. Humphries’ scope included many custom millwork components, stone flooring, DIRTT wall systems, custom graphic film, full audio visual package, server rooms with supplemental HVAC, split reception desk with custom millwork extending through glass walls into the break room, a …

Popeyes Louisiana Kitchen Headquarters Read More »

Northwestern Mutual

This 52,000 square foot project at Phipps Tower was a high-end first generation corporate office project on two floors. The construction included two reception areas with custom millwork desks, two elevator lobbies, large cafés with banquette seating on each floor, multiple conference rooms and a large training room. The finishes consisted of marble floors, wood …

Northwestern Mutual Read More »

North Highland

Located in the heart of Buckhead in Terminus 200, the North Highland Atlanta office is a high-end commercial project occupying 70,000 SF on three floors. Extensive use of canted glass, elliptical wood paneling and an earth tone color palette help create an inviting workplace for over 200 consultants and their clients. The North Highland project …

North Highland Read More »

Corenet Global

CoreNet was an 8,500 square foot project located at Georgia-Pacific Center in downtown Atlanta and was a partial floor renovation.  This project was in collaboration with Georgia-Pacific Center’s ongoing stride to make LEED-EB.  Thus, the project finishes consisted of cork flooring, FSC wood, and recycled materials such as doors, hardware, glass doors, and sidelights. The …

Corenet Global Read More »